Does the Waterview Tunnel go underwater?
The Waterview Tunnel is a twin road tunnel in west Auckland, New Zealand. At 2,400 metres (7,900 ft) long, it is New Zealand’s longest road tunnel….Waterview Tunnel.
Alice the Tunnel Boring Machine during the construction of the Waterview Tunnel | |
Overview | |
---|---|
Official name | Waterview Tunnel |
Location | Auckland, New Zealand |
Who designed the Waterview Tunnel?
Herrenkencht
Tunnel facts The Tunnel Boring Machine was specifically designed for the Waterview geology by the German company, Herrenkencht, and manufactured in China. The Tunnel Boring Machine was 87m long.
How much did the Waterview Tunnel cost?
How much did the Tunnel cost to build? $1.4 billion for the Waterview Connection project, including the Great North Road interchange.
How long did it take to build the Waterview Tunnel?
Construction was expected to start in the first half of 2012 subject to tender and NZTA funding, and take up to two years to complete. On 17 April 2012 Auckland Transport announced that NZTA would fund 53% of the project.
What is the longest tunnel in New Zealand?
Lyttelton tunnel
Longest tunnels New Zealand’s two longest road tunnels are the Homer Tunnel and the Lyttelton tunnel. The Homer Tunnel was first suggested in 1890 as a route to Milford Sound. Work on it finally began in 1935 as an unemployment relief project with little more than shovels and wheelbarrows.
Are there speed cameras in the Waterview Tunnel?
The Waterview Tunnels have a number of systems in place to encourage safe behaviour. This includes four cameras that are capable of monitoring speed, which Police have now switched to enforcement mode.
What is the longest road tunnel in New Zealand?
How long is Homer Tunnel?
1.2 km
The Homer Tunnel The tunnel, at 945 m above sea level, is 1.2 km long and has a steep gradient down towards Milford.
Who built Lyttelton tunnel?
The tunnel was built at a cost of £3 million by a joint venture consortium of New Zealand owned Fletcher Construction Ltd, and the American Henry J. Kaiser Co. Construction started in 1962 with the tunnel opened on 27 February 1964. It is currently our longest road tunnel at 1,970 metres (6,460 ft) in New Zealand.
How long did it take to build Lyttelton tunnel?
three years
It took three years to build. Sunday’s celebrations were attended by many of the men who built the tunnel and also those who manned the toll booths. It was a memorable day and the community is already planning the next event when the tunnel turns 100!